3-Pin Power Cord (C13) 220V
Sensors · 1 option in stock
Sensors and their wiring — thermistors, heater cartridges, limit switches, proximity switches. The parameters are listed in order of importance: the one at the top decides the most, and no amount of care further down makes up for getting it wrong.
This page lists 1 option, from ¥2.08.
What this part is
C13 power cord: a C13 socket on one end for the equipment, a Chinese standard three-pin plug on the other, 220 V / 10 A. The default lead for 3D printers, engravers and cabinet power.
The parts of this item
Figure 1 — Cable needs three things: cores, gauge, length — connectors are extra; leave them out and you crimp your own
The parameters that matter
Not every number on a part like this is worth the same. These are the ones that decide whether it fits and works, and what to look at for each.
| Parameter | What to check |
|---|---|
| Connector | C13. It mates with a C14 inlet — not C5 (cloverleaf) and not C19 (large). |
| Conductor | 3×0.75 mm² or 3×1.0 mm². 0.75 is enough for 10 A, but go up a size on long runs. |
| Length | 1 m / 1.5 m / 2 m. Longer means more voltage drop. |
| Approval | CCC. Three pins with earth — never cut the earth off. |
Reading the part numbers
| Part no. | Configuration |
|---|---|
P3-124 | single configuration |
You can order by part number or by selecting the parameters. The part number is fastest, but it does not always encode every parameter — the selector on this page is the authority.
6 common mistakes
- Thermistor B value and resistance both matter. NTC 100K with B=3950 and B=3435 are not interchangeable — the reading will be tens of degrees out.
- Normally open and normally closed. Wired the wrong way it either triggers permanently or never triggers, and both look like a firmware problem.
- Do not exceed the voltage. Most of these are 5 V or 24 V logic; the wrong supply destroys them instantly.
- Route the cable with a service loop. The break always happens at the point where the cable leaves the fixing.
- Measure before you order. Take the old part off and measure it, or send us a photo with the caliper reading — that beats guessing from a model number every time.
- Everything here is in millimetres. Where a size is imperial, convert it: 1" = 25.4 mm, 1/4" = 6.35 mm, 3/32" = 2.38 mm.
Telling it apart from lookalikes
Against a C5 cloverleaf lead: C5 is also three-pin but smaller with a different spacing. C13 is the standard for desktop equipment and cabinets.
Confirming it is the right part
This page has one configuration, so there is nothing to choose — which makes confirming that it is the right part more important than studying the specification. Three steps is enough:
- Measure the mating dimension — the one place this part touches something else: bore, shaft, thread, tube OD, or hex across flats. It is the number people get wrong, and half a millimetre out means it will not fit.
- Measure the outline and the mounting hole spacing. Two parts that do the same job from two makers often differ by 2–3 mm between holes: it looks like it will fit, and it goes on crooked.
- Send us two photographs: one general view showing the machine and where the part sits, and one close-up with the caliper reading in shot. If the machine has a nameplate, include it — plenty of these parts are specific to one machine, and the model number locates them faster than dimensions do.
When to replace it
You do not replace this until it fails — but "still looks usable" and "still reliable" are two different things. Any one of these and it is time:
- Trigger point drifting, or false triggers.
- Contacts blackened and oxidised, contact resistance rising.
- Broken core at the cable root — the usual place.
Fitting and use
Before wiring
- Confirm voltage and polarity first. Reversed, it is destroyed on the first switch-on — there is no second chance. DC parts especially.
- Wire with the power off, then check continuity and insulation with a meter before you apply power.
- Crimp or tin the wire ends. Twisting bare strands onto a terminal gives a high-resistance joint that heats up.
Mounting
- Leave the heated parts some air. Do not mount them against plastic or against the cable run.
- Parts with a direction (fans, check valves) have an arrow. Reversed, you lose most of the airflow or flow.
- Fasten it properly. Vibration loosens terminals, and loose terminals are the most common electrical failure there is.
First power-up
- First power-up from a current-limited supply, or through a fuse. If something is wrong the damage stays small.
- Run it unloaded first, measure current and temperature, then add load.
- After 30 minutes feel the terminals and the cable. Anything noticeably warm means high contact resistance — re-crimp it.
Three things not to do
- Do not connect or disconnect under power unless it is explicitly rated for hot-plug. The arc damages the terminals.
- Do not run above the rating. It works for a while, then it does not.
- Do not skip the earth or the fuse. You save a few yuan and risk the machine.
Matching parts
- Wire and terminals
- Mounting brackets
Lead time, custom work and shipping
- Stock sizes: dispatched in 1–2 working days, subject to stock
- Custom: non-standard sizes, materials and treatments are possible — send quantity and drawing
- Shipping: from Shenzhen; domestic courier by default, DHL or dedicated line for export
- Volume: quantity pricing available, contact us for a quote
If you cannot find the size you need, or you are not sure which one fits, send us the problem you are solving — what machine it goes on, the dimensions of the part you have, what it has to achieve — and we will match it.